Non-Compliance detail


  
Summary
 
Licence number: 1461
Annual Return Start: 01 Dec 2012
Annual Return End: 30 Nov 2013
Date Received: 30 Jan 2014
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M6.1 Wastewater monitoring did not occur on 15 days of the reporting period due to failure of the in-line meter. Water usages were checked to ensure that wastewater volumes were not excessive. Meter was replaced & has been operational since. Appropriate Action taken by licensee 1
U1.1 PRP items c) & d) were not completed by the compliance date of 30/10/13. A decision not to proceed with SBR implementation & time required to delevop a plan to achieve compliance with item d) was the cause. Negotiations continue with EPA Grafton EPA has written to licensee regarding non-compliance and relevant action 1